A1.1 Plan the SEM Project.
A1.2 Create coarse grain enterprise information model.
A1.3 Approve coarse grain enterprise information model.
A1.4. Refine enterprise information model.
A1.5 Approve fine grain enterprise information model.
A1.6. Inventory existing information systems.
A1.7 Develop information systems architecture.
A1.8 Develop action plan.
A1.9 Approve action plan.
A1.10 Identify information resource management principles.
A1.11 Characterize current technology environment.
A1.12 Characterize target technology environment.
A1.13 Define technology migration plan.
A1.14 Manage the introduction of new technology.
A2.1 Set initial project objectives and scope.
A2.2 Refine project scope.
A2.3 Define project's benefits.
A2.4 Identify sources of business knowledge.
A2.5 Prepare preliminary project timeline.
A2.6 Determine preliminary project costs.
A2.7 Establish business user participation.
A2.8 Identify source of project funding/resources.
A2.9 Decide whether to continue with project.
A2.10 Prepare project plan.
A2.11 Create formal project plan document.
A2.12 Set analysis stage standards.
A2.13 Liaison with UCD control function groups.
A3.1 Acquire initial understanding
A3.2 Produce entity relationship diagram
A3.3 Produce process model
A3.4 Analyze involvement matrices
A3.5 Confirm outline business model
A3.6 Analyze distribution
A3.7 Define design areas
A3.9 Analyze entity type life cycles
A3.10 Analyze process logic
A3.11 Analyze business rules
A3.12 Analyze current systems
A3.13 Confirm correctness of the detailed business model
A3.14 Reaffirm design area evaluation
Business System Design Phase Tasks
A4.1 Design system structure
A4.2 Design for implementation
A4.3 Design preliminary data structures
A4.4 Define data and procedure interactions
A4.5 Design procedures
A4.6 Check design completeness
A4.7 Check design correctness
A4.8 Plan for technical design
Technical Design Phase Tasks
A5.1 Construct computing environment
A5.2 Prepare development procedures and conventions
A5.3 Establish database environment
A5.4 Generate implementable module
A5.5 Generate test data and system documents
A5.6 Finalize implementation plan
A5.7 Perform integration tests
A5.8 Perform system tests
A5.9 Perform benchmark tests
A5.10 Perform acceptance tests
A10.1 Research current situation
A10.2 Define requirements
A10.3 Finalize requirements
A11.1 Produce detailed system area model
A11.2 Develop outline system design
A11.3 Refine system design
A11.4 Prepare implementation plan
A11.5 Finalize system design
A11.6 Obtain approval for construction
A12.1 Prepare for rapid construction
A12.2 Construct the system
A12.3 Generate test data and system documents
A12.4 Prepare for implementation
A12.5 Verify system construction
A6.1 Train users
A6.2 Perform data conversion
A6.3 Install production system
A6.4 Accept system installation
A6.5 Support the implementable module
A6.6 Respond to emergency situations
A7.1 Define project(s) to evaluate.
A7.2 Gather evaluated project's information.
A7.3 Evaluate methods and techniques employed in the evaluated project(s).
A7.4 Publish Post Implementation Assessment.
A8.1 Evaluate System
A8.2 Assess Changes or Enhancement Requests
A8.3 Analyze the Nature of the Change
A8.4 Analyze the Impact of the Change
A8.5 Execute the Change