University of California, Davis
Application Development Methodology
Table of Contents
Documented Errors
ADM
Purpose
Application Development Methodology
Introduction
ADM Document
Structure
ADM Document
Description
When
to use Application Development Methodology
ADM
Lifecycle
ADM
Stages
Overview
ADM
Development
Paths
:
Feasibility/Assessment
Project (FAP)
Small System
Project (SSP)
Large System
Project (LSP)
Purchased System
Project (PSP)
Rapid Application
Project (RAD)
Business Process Reengineering
Project (BPR)
Object Oriented Development Project
ADM
Tasks and Deliverables
by Stage
Enterprise Modeling
Stage
Project Initiation
Stage
Analysis
Stage
Design
Stage
Construction
Stage
Rapid Application Development
(RAD)
Requirements Planning
(for RAD)
User Design
(for RAD)
Rapid Construction
(for RAD)
Implementation
Stage
Post Implementation Assessment
Stage
System Modification
Stage
ADM
Matrix Series:
"Task Performed by Role"
ADM Matrix Series:
Task by Role (for General Development Path)
ADM Matrix Series:
Task Performed by Role (for RAD Path)
ADM
Roles and Responsibilities
ADM
Role Descriptions
ADM
Responsibility Descriptions
ADM
"Task is performed by Role"
Matrix
ADM
Techniques
ADM
Technique Descriptions
ADM
Technique Concepts and Terms
ADM
Glossary
ADM
Bibliography
Appendix
: Examples of Forms, Procedures, and Templates
Overview
:
UCD ADM Home Page
This page was last built on May 29, 1997.