Implementation Stage

The implementable module and its documentation are deployed and placed in operational use. This includes the information system software, files and databases which are utilized by the information system, operational documentation, system and program documentation, trained staff and integration of the foregoing into the operational environment.

Stage Scope : An implementable module defined in a construction project.

Stage Input : An Implementable Module.

Stage Tasks :

A6.1 Train users

A6.2 Perform data conversion

A6.3 Install production system

A6.4 Accept system installation

A6.5 Support the implementable module

A6.6 Respond to emergency situations

Stage Output : Operational system integrated with pre-existing operational systems.

D6.1 Training:

D6.2 Data Conversion:

D6.3 Production Environment:

D6.4 User Acceptance Agreement:

D6.5 Project Initiation Request.


Next : Post Implementation Assessment Stage

Previous : Rapid Construction (for RAD)

Section Overview : Tasks and Deliverables by Stage

Overview : Table of Contents


This page was last built on April 11, 1997.