The information system and the data structures which it will utilize are created. The deliverable of this stage is referred to as an implementable module (IM). In addition, the implementation plans, operational documentation and operational training for the implementable module are created in this stage. The unit of work represented by this stage is referred to as a construction project.
Stage Scope : A module defined by a design project.
Stage Input : Single information system design.
A5.1 Construct computing environment
A5.2 Prepare development procedures and conventions
A5.3 Establish database environment
A5.4 Generate implementable module
A5.5 Generate test data and system documents
A5.6 Finalize implementation plan
A5.7 Perform integration tests
A5.8 Perform system tests
A5.9 Perform benchmark tests
A5.10 Perform acceptance tests
Stage Output : Single, tested Implementable Module; with all documentation and training completed.
D5.1 Technology Environment:
D5.2 Development Environment:
D5.3 Production Mode:
D5.4 Testing:
D5.5 Training Deliverables:
D5.6 User Deliverables:
D5.7 Implementation Deliverables: