Following is an overview of the ADM Paths in which each of the ADM Stages participate:
|
Stage |
Small |
Large |
Purch-ased System |
RAD |
Feas./ |
|
| 1. Enterprise Modeling | ||||||
| 2. Project Initiation |
X |
X |
X |
X |
X |
|
| 3 Analysis |
X |
X |
X |
X |
||
| 4 Design |
X |
X |
X |
|||
| 5 Construction |
X |
X |
X |
|||
| 10 Requirements Planning |
X |
|||||
| 11 User Design |
X |
|||||
| 12 Rapid Construction |
X |
|||||
| 6 Implementation |
X |
X |
X |
X |
||
| 7 Post Implementation Assessment |
X |
X |
X |
X |
||
| 8 System Modification |
X |
X |
X |
X |
Task Performed by Role" Matrix Series (for General Development Path)
Task Performed by Role" Matrix Series (for RAD Path)
Overview : Table of Contents