Task |
RAD |
| 12. Rapid Construction (for RAD): | |
| A12.1 Prepare for rapid construction: | |
| A12.1.1 Design database |
R |
| A12.1.2 Test production facilities |
O; TPM & SA |
| A12.1.3 Complete test strategy |
R |
| A12.2 Construct the system: | |
| A12.2.1 Construct database |
R |
| A12.2.2 Define procedure actions |
O; TPM |
| A12.2.3 Generate code |
R |
| A12.2.4 Perform unit tests |
R |
| A12.2.5 Manage coordinating model |
R |
| A12.3 Generate test data and system documents: | |
| A12.3.1 Develop operations instructions |
R |
| A12.3.2 Develop documentation |
R |
| A12.3.3 Develop system test plan |
R |
| A12.3.4 Develop system test data |
R |
| A12.3.5 Load system test database and files |
R |
| A12.4 Prepare for implementation: | |
| A12.4.1 Finalize implementation strategy |
R |
| A12.4.2 Develop training plan |
R |
| A12.4.3 Finalize contingency plan for implementation failure |
R |
| A12.4.4 Finalize implementation work steps |
R |
| A12.4.5 Develop training materials |
O; BPM |
| A12.4.6 Resolve organizational issues |
R |
| A12.4.7 Prepare implementation procedures |
R |
| A12.4.8 Develop data conversion routines |
O; TPM |
| A12.4.9 Test implementation arrangements |
O; TPM |
| A12.5 Verify system construction: | |
| A12.5.1 Perform integration tests |
O; TPM |
| A12.5.2 Review integration testing |
O; TPM |
| A12.5.3 Review system test plan |
O; TPM |
| A12.5.4 Perform system tests |
O; TPM |
| A12.5.5 Devise acceptance tests |
R |
| A12.5.6 Perform the acceptance test |
R |
Rapid Application Development (RAD) Path
Next : Implementation Stage Matrix
Previous : User Design Matrix
Matrix Overview : "Tasks Performed by Role" for RAD Path
Stage Overview : Rapid Construction Stage
Overview : Table of Contents
This page was last built on May 01, 1997.