University of California, Davis

Application Development Methodology

"Task Performed by Role" Matrix

for Rapid Application Development (RAD) Path

Rapid Construction Stage

Task

RAD
Project Path

12. Rapid Construction (for RAD):
A12.1 Prepare for rapid construction:
A12.1.1 Design database

R

A12.1.2 Test production facilities

O; TPM & SA

A12.1.3 Complete test strategy

R

A12.2 Construct the system:
A12.2.1 Construct database

R

A12.2.2 Define procedure actions

O; TPM

A12.2.3 Generate code

R

A12.2.4 Perform unit tests

R

A12.2.5 Manage coordinating model

R

A12.3 Generate test data and system documents:
A12.3.1 Develop operations instructions

R

A12.3.2 Develop documentation

R

A12.3.3 Develop system test plan

R

A12.3.4 Develop system test data

R

A12.3.5 Load system test database and files

R

A12.4 Prepare for implementation:
A12.4.1 Finalize implementation strategy

R

A12.4.2 Develop training plan

R

A12.4.3 Finalize contingency plan for implementation failure

R

A12.4.4 Finalize implementation work steps

R

A12.4.5 Develop training materials

O; BPM

A12.4.6 Resolve organizational issues

R

A12.4.7 Prepare implementation procedures

R

A12.4.8 Develop data conversion routines

O; TPM

A12.4.9 Test implementation arrangements

O; TPM

A12.5 Verify system construction:
A12.5.1 Perform integration tests

O; TPM

A12.5.2 Review integration testing

O; TPM

A12.5.3 Review system test plan

O; TPM

A12.5.4 Perform system tests

O; TPM

A12.5.5 Devise acceptance tests

R

A12.5.6 Perform the acceptance test

R


Rapid Application Development (RAD) Path

Next : Implementation Stage Matrix

Previous : User Design Matrix

Matrix Overview : "Tasks Performed by Role" for RAD Path

Stage Overview : Rapid Construction Stage

Overview : Table of Contents


This page was last built on May 01, 1997.