University of California, Davis

Application Development Methodology

"Task Performed by Role" Matrix

for Rapid Application Development (RAD) Path

User Design Stage

Task

RAD
Project Path

11. User Design (for RAD):
A11.1 Produce detailed system area model:
A11.1.1 Complete entity relationship diagram

R

A11.1.2 Complete process model

R

A11.1.3 Perform interaction analysis

O; TPM

A11.1.4 Confirm system area model

R

A11.1.5 Develop clustered process/entity type matrix

R

A11.2 Develop outline system design:
A11.2.1 Define system procedures

R

A11.2.2 Identify reusable design structures

O; TPM

A11.2.3 Design system structure

R

A11.2.4 Design screen/report layouts

R

A11.2.5 Identify implementation requirements

R

A11.2.6 Identify open issues

R

A11.3 Refine system design:
A11.3.1 Confirm consistency and completeness of system area model

O; TPM & BPM

A11.3.2 Develop preliminary data structure

R

A11.3.3 Develop prototypes

R

A11.4 Prepare implementation plan:
A11.4.1 Estimate construction effort

R

A11.4.2 Finalize construction approach

R

A11.4.3 Develop testing strategy

R

A11.4.4 Develop implementation plan

R

A11.5 Finalize system design:
A11.5.1 Resolve open design issues

R

A11.5.2 Discuss suggested design improvements

O; TPM & BPM

A11.5.3 Review implementation plan

O; TPM & BPM

A11.6 Obtain approval for construction:
A11.6.1 Incorporate final JAD workshop results

R

A11.6.2 Obtain approval to proceed

R


Rapid Application Development (RAD) Path

Next : Rapid Construction Matrix

Previous : Requirements Planning Matrix

Matrix Overview : "Tasks Performed by Role" for RAD Path

Stage Overview : User Design Stage

Overview : Table of Contents


This page was last built on May 01, 1997.