Task |
RAD |
| 10. Requirements Planning (for RAD): | |
| A10.1 Research current situation: | |
| A10.1.1 Examine previous studies |
O; TPM |
| A10.1.2 Examine current system |
R |
| A10.1.3 Structure overall objectives of the system |
R |
| A10.1.4 Identify reusable structures |
O; TPM |
| A10.1.5 Create an overview of proposed area |
O; BAA |
| A10.2 Define requirements: | |
| A10.2.1 Prepare for the JRP workshop |
R |
| A10.2.2 Develop outline system area model |
R |
| A10.2.3 Scope system |
R |
| A10.2.4 Identify potential benefits |
R |
| A10.2.5 Document implementation considerations |
R |
| A10.3 Finalize requirements: | |
| A10.3.1 Formalize scope definition |
R |
| A10.3.2 Identify development environment |
R |
| A10.3.3 Initiate acquisition of production facilities |
R |
| A10.3.4 Estimate implementation schedule |
O; TPM & BPM |
| A10.3.5 Estimate development cost |
O; S |
| A10.3.6 Present results to sponsor |
R |
Rapid Application Development (RAD) Path
Next : User Design Matrix
Previous : Project Initiation Stage Matrix
Matrix Overview : "Tasks Performed by Role" for RAD Path
Stage Overview : Requirements Planning Stage
Overview : Table of Contents
This page was last built on May 01, 1997.