University of California, Davis

Application Development Methodology

"Task Performed by Role" Matrix

for General Development Path

System Modification Stage

Stage/Task

Small
System

Large
In-house
Develop
System

Purch-ased System

Feas./
Assmnt.
Project

8. System Modification:
A8.1 Evaluate system

O; BPM

O; TPM & BPM

O; TPM & BPM

N/A

A8.2 Assess changes or enhancement requests

O; BPM

O; TPM & BPM

O; TPM & BPM

N/A

A8.3 Analyze the nature of the change

O; BPM

O; TPM & BPM

O; TPM & BPM

N/A

A8.4 Analyze the impact of the change

O; BPM

O; TPM & BPM

O; TPM & BPM

N/A

A8.5 Execute the change

O; BPM

O; TPM & BPM

O; TPM & BPM

N/A


General Development Path

Next : This is the Matrix for the Last Stage.

Previous : Post Implementation Assessment Stage Matrix

Section Overview : Tasks Performed in General Development Path

Stage Cross Reference: System Modification Stage

Overview : Table of Contents


This page was last built on April 29, 1997.