Stage/Task |
Small |
Large |
Purch-ased System |
Feas./ |
|
| 8. System Modification: | |||||
| A8.1 Evaluate system |
O; BPM |
O; TPM & BPM |
O; TPM & BPM |
N/A |
|
| A8.2 Assess changes or enhancement requests |
O; BPM |
O; TPM & BPM |
O; TPM & BPM |
N/A |
|
| A8.3 Analyze the nature of the change |
O; BPM |
O; TPM & BPM |
O; TPM & BPM |
N/A |
|
| A8.4 Analyze the impact of the change |
O; BPM |
O; TPM & BPM |
O; TPM & BPM |
N/A |
|
| A8.5 Execute the change |
O; BPM |
O; TPM & BPM |
O; TPM & BPM |
N/A |
|